Pedestal / Dropper Tube
Assembly & Installation Instructions
Drawings
Pedestal Assembly GTL-0000-12
All instructions are referenced to the drawings provided for installation
- Refer to General Arrangement Drawing for each unit size and detail drawing GTL-0000-12 for the set out of the pedestal, dropper combination. Position, mark and cut a 345mm hole in the cubical floor for the dropper tube
- Slide the dropper tube down onto the primary tank lid. Plumb the tube and mark the position of the tube on the lid. Locate the dropper tube in-fill piece. It is the template of the hole size required for correct installation of the dropper tube. Mark around the template and cut the hole in the tank lid. A jigsaw is the ideal power tool for this job.
- Slide the dropper tube down through the floor and engage it in the tank lid. It should only penetrate the lid a maximum of 20mm.
- Inside the cubicle measure 380mm above the floor level and mark. Cut the dropper tube off at this length.
- Place the floor plate over the dropper tube so that it rests on the floor. Use the in-fill piece to seal any remaining holes where the dropper tube and floor meet. Cut this to the size required and seal with sealant provided at the same time.
- Install the toilet seat and lid, tightening the wing nuts from the underside of the toilet pedestal.
- Install the toilet pedestal by placing it over the dropper tube. Square the pedestal to the wall and screw it to the floor using 6 x 15 gauge 1.5" stainless steel screws.
- Now, seal the gap between the primary tank and the dropper tube.
- Finally, check that all fixings are secure and that there are no leaks.
THANK YOU FOR CHOOSING THE HYBRID TOILET SYSTEM
Should you have any problems with installation of this system, please do not hesitate to contact:
Your local agent on 1800 069 805
|